
Our Work
US Forest Service Work Center – Sanitary Sewer
Underground Utilities
Sanitary sewer installation—trenches, pipe, and structures for the work center’s on-site collection system.
Sanitary sewer was installed to maintain positive flow through the work center site, with trenches cut to grade, pipe bedded and joined per spec, and backfill placed to protect the line. Our crew coordinated with domestic water and leach field work so crossings, depths, and inspection holds stayed aligned on this federal facility upgrade.
Learn more about our Underground utilities capabilities.
Project photos
Click a photo to view full size